Francis Turbine Test Rig

Categories:

 Experiment:To study the operation of a Francis TurbineTo determine the Output Power of Francis TurbineTo determine the Turbine EfficiencyUtilities Required:Water Supply and DrainElectricity 15 kW, 44...


title icon
Product

Description

 

Experiment:
  • To study the operation of a Francis Turbine
  • To determine the Output Power of Francis Turbine
  • To determine the Turbine Efficiency
Utilities Required:
  • Water Supply and Drain
  • Electricity 15 kW, 440V AC, Three Phase
  • Floor Area 1.5 x 0.75 m


title icon
Product

Reviews

add Review
reviews

    No Review Yet.

quick overview :

 

Experiment:
  • To study the operation of a Francis Turbine
  • To determine the Output Power of Francis Turbine
  • To determine the Turbine Efficiency
Utilities Required:
  • Water Supply and Drain
  • Electricity 15 kW, 440V AC, Three Phase
  • Floor Area 1.5 x 0.75 m

title icon
Product

Reviews

add Review
reviews

    No Review Yet.